How to set steel scaffold screw jack

1. Place each vertical lever vertically on the pad.

2. The vertical bar of the scaffold is 20cm away from the wall of the wall, and the feet are more than 20cm.

3. The scaffold is afraid of the vertical and horizontal sweep. The vertical sweep rod is fixed on a vertical rod with a right Angle fastener, which is not more than 200 on the base. The horizontal sweep lever is also fixed by a right Angle fastener on the vertical bar under the vertical sweep rod. When the vertical rod based not on the same height, must be high vertical sweeping lever downward extension of two long across and vertical rod is fixed, high and low difference is not less than 1 m. Scaffolding screw jack stand on slope at the top of the stem axis to the slope distance not less than 500 mm.

scaffolding screw jack

4. The upright rod must be connected to the building with a connected wall.

5. The top step of the vertical rod shall be adopted by the top step, and the other layers shall be used. Connect the connection of the scaffolding coupler. The joints and joints shall meet the following requirements. Stud on the docking scaffolding coupler staggered, two adjacent stud joints staggered, not set up within the synchronization, synchronization across a vertical rod inside the two joints in the height direction of stagger distance apart should not less than 500, the distance form the centre of the joint to the master node is not greater than 1/3 of the interval.

The length of the lap shall not be less than 1m, shall be fixed with no less than 2 rotating fasteners, and the edge of the end of the end of the plate shall not be less than 100mm.

Advertisements

5 Safety Tips When Working with Scaffolding

Don’t sacrifice safety and efficiency for speed; use these five tips from ADTO Group to keep workers safe when working with scaffolding

Fall prevention is one of the biggest buzz words of construction safety. Fall prevention permeates so many different areas of construction, including scaffolding use and safety. ADTO Groupa global supplier of scaffolding, shoring frame & formwork, recently get a list of five scaffolding safety tips designed to help contractors “stay proactive about scaffolding safety”.
scaffolding dismantle

kwikstage scaffold used in Australian construction sites

Tip 1: Slow down or consider efficiency building alternatives

While the pace at which construction work gets finished is often important to projects and budgets, it can also influence careless and costly mistakes, including gaps in safety on the jobsite. By focusing on greater efficiency, safety does not have to be comprised

Tip 2: Keep your workplace organized

Avoid slip, trip and fall hazards by keeping the worksite organized. When working with scaffolding, keeping tools organized can reduce the risk of tools falling from scaffolding. It can also make moving around on the scaffolding safer for workers.

Tip 3: Identify Hazards

This should be done before work starts and while work is being done. Identify possible hazards and solutions prior to the start of work. Working near power lines? Keep scaffolding far enough away to prevent electrocution risks. Will the scaffolding need to be moved during the project? Form a game plan before each erection.

Tip 4: Proper training

As with all aspects of a construction jobsite, make sure your workers are trained and up to date with OSHA requirements.  Training in the setup and construction of scaffolding can ensure a solid work space for overhead workers and guarantee a rig that will not inadvertently collapse from instability.

Tip 5: Review the site

In addition to identifying hazards, continue to review the worksite throughout the construction project to identify any new hazards that might arise during construction. Keeping an eye out for possible hazards can help eliminate them from happening. As work continues on, workers will become more comfortable on the job. This can cause some to inadvertently (or blatantly) neglect safety.

Great Event – 122nd Canton Fair

As all we know, the Autumn Canton Fair is held in every October.

ADTO, as the lead supplier of scaffolding & formwork in China, has been presented itself

brand image in the fair from Oct 15th – 19th

Products: scaffolding, formwork,tube, steel structure, aluminum ladder, PPGL,

around 200 kinds of construction materials on show

Area: 72.0 s.q.m

Voucher delivered: 500pcs(USD 260,000 in total)

Customer recept: 1400 batch

Contract signed on site:  21, total contract value around USD 2.0 million

1245673

122th Canton Fair presentd in October

As far as you know, the Canton Fair is the largest trade fair in China presented 55 categories trading products.
Glad to say that ADTO has been attended this fair for many years, and also this time.
China Import & Export Fair ( Canton Fair)
Booth No.:  11.2 G30-32 & H15-19
Items Presented: Scaffolding, Formwork, Coated Steel and other building materials
Date: October 15th  – 19th
Time: 9:30 – 18:00
Address: Area B, No 380, Yuejiang Zhong Road, Guangzhou, China
122th Canton Fair.jpg

What is the shoring frame system in Formwork construction sites?

The V-Shore System is a high load conventional shoring system consisting of three components: frames, braces and jacks, fast to erect and strip.

It’s very popular in the domestic and small commercial building sector, and offers the benefits of saving costs on inventory, improved productivity and design versatility.

It is the ideal system for civil engineering projects such as the construction of highway bridges or the laying of heavy slabs or beams.

Material: Galvanised Steel (Q235, Q345)

Surface: Painted, Galvanized

Color: self color or as custom’s requirement

Standard: AS 3610

Components:

  • Formwork shoring V Frame – 2 pieces
  • Formwork Cross Brace – 2 pieces
  • Formwork Base (Flat) Jack – 4 pieces
  • Formwork U-Head Jack – 4 pieces
  • Frame Connectors – 4 pieces

formwork application

Advantages:

  • Hot Dipped Galvanised (HDG) prevents rusting and requires minimal maintenance
  • Stackable and distance between frames can be adjusted with different sizes of braces
  • High bearing capacity (Safe Load Limit36 KN per leg) and can reach to different shoring heights
  • Versatile in different projects
  • All welds have a lifetime guarantee
  • Lowest price guaranteed