The Building of Scaffolding Tubes is the Beginning of the Project

Scaffolding refers to the construction site for workers operation and solve the vertical and horizontal transportation and erection of all kinds of support.

Architecture of the generic term, refers to the construction site in exterior, interior, or higher storey height can’t construction directly. Mainly for construction personnel working up and down or peripheral safety maintenance and high altitude installation components etc, to put it bluntly, is which the scaffold materials usually are: bamboo, wood, steel or synthetic materials.

Pre-galvanized steel pipes5.jpg

 

Some works also use scaffolding tubes when the template is used, in addition in the advertising industry, municipal, transportation, mining and other departments is also widely used. ADTO scaffolding rental scaffolding, scaffolding construction good helper, is your right choice.

After the removal of scaffolding square tube should be according to the first open principle, according to the following procedures: from cross-border open at the top of the armrest and baluster at first, and then dismantle scaffold board and escalators, and unload horizontal rod reinforcing rod and bracing.

Since the top edge began to remove cross sustaining, synchronous remove the top bracing rod with the wall top door frame. Continue to phase synchronization under the demolition of the second step the door frame and accessories. Scaffold free cantilever height shall not exceed three steps, or shall provide temporary Rachel.

tube coupler scaffold

To remove the continuous synchronization. For even the wall rod, scissors, long horizontal, must be removed in the scaffold to relevant across the door frame, before dismantling. Demolition of sweeping bar, the bottom door frame and sealing bar. Demolition of base plate and pad.